How long does a Modex roof replacement take?

Answers from the sources

  1. Modern Exterior Systems

    “1–2 days for a standard asphalt full-house install. 4–10 days for premium synthetic slate or stone-coated steel. The pre-install timeline (inspection through material order) adds 30–45 days; insurance claim work adds another 30 days on the front.”