How long does it take to design and permit an EV charging project?

Answers from the sources

  1. SLC Energy Solutions

    “Design timelines depend less on the drawings and more on the utility. A site with adequate existing capacity can move quickly; a site that needs a service upgrade or a distribution study waits on the utility's queue.”