What are your typical lead times?

1 company with a published answer

  1. Toray Advanced Composites

    “Toray takes pride in setting a high standard for responsiveness and lead times on deliveries. Our lead times are generally six to eight weeks for standard products. If we have the required raw materials in stock, then our lead times are normally less than six weeks, and can be expedited for faster delivery if needed.”